Shug Jordan Parkway temporary single lane closure expected Nov. 4
October 30 2026
AUBURN, Ala. - The outside southbound lane of Shug Jordan Parkway between Richland Road and the National Guard Armory is expected to be temporarily closed Nov. 4 as Alabama Power completes work in the area. The closure is scheduled from 8 a.m.-4 p.m.
Traffic control measures will be in place to maintain the flow of traffic. Drivers are advised to use alternate routes to reduce delays.